BATTERY STORAGE · PJM

Paulding Storage II

Paulding Storage II is a 50.0 MW battery storage request in interconnection study in the PJM interconnection queue, in Paulding County, Ohio, connecting to AEP.

Queue statusIn planning
  1. PlanningQueued Mar 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AF2-376
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Developer
Paulding Wind Farm II LLC
Connection point (POI)
Timber Switch 138 kV
Location
Paulding County, Ohio
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Active
Entered queue
31 March 2020
Proposed online date
October 2023

Location

Marker shows the centre of Paulding County; the queue data does not give exact sites.