ONSHORE WIND · PJM

Timber Road II WF

Timber Road II WF is a 97.0 MW onshore wind request built and operating in the PJM interconnection queue, in Paulding County, Ohio, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Dec 2006 (completed)
  2. ConsentedOct 2010 (completed)
  3. Construction (completed)
  4. OperatingJul 2011 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
R49
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Haviland - Milan 138kV
Location
Paulding County, Ohio
Technology
Wind: 97.0 MW
Total requested
97.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
6 December 2006
Agreement signed
18 October 2010
Proposed online date
December 2012
Came online
July 2011

Location

Marker shows the centre of Paulding County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Paulding County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem