ONSHORE WIND Β· PJM

Trishe Wind Ohio, LLC

Trishe Wind Ohio, LLC is a 150 MW onshore wind request withdrawn in the PJM interconnection queue, in Paulding County, Ohio, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2009 (completed)
  2. Withdrawn / abandonedMay 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
V1-012
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Haviland 138kV
Location
Paulding County, Ohio
Technology
Wind: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
26 February 2009
Proposed online date
December 2015
Withdrawn
May 2018

Location

Marker shows the centre of Paulding County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Paulding County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem