πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

OTHER Β· MISO

Surplus; Gibson Generating Station

Surplus; Gibson Generating Station is a 7.5 MW other request in interconnection study in the MISO interconnection queue.

Queue statusIn planning
  1. PlanningQueued Jun 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1001
Grid region
MISO (Midcontinent)
Technology
Other: 7.5 MW Β· Battery
Total requested
7.5 MW
Queue status
Active
Entered queue
25 June 2020
Withdrawn
June 2024

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem