United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMScout Storage I
Scout Storage I is a 9.0 MW battery storage request suspended in the PJM interconnection queue, in Accomack County, Virginia, connecting to DPL.
Queue statusPaused / redesign
- PlanningQueued Jan 2020 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AF2-060
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Wattsville 12 kV
- Location
- Accomack County, Virginia
- Technology
- Battery: 9.0 MW
- Total requested
- 9.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Suspended
- Entered queue
- 25 January 2020
- Proposed online date
- April 2026
Location
Marker shows the centre of Accomack County; the queue data does not give exact sites.
Other requests in Accomack County
- Battery storage project AH2-050, Accomack CountyBattery storage · 20.0 MW · in study
- Switchgrass Solar 1Solar · 49.0 MW · suspended
- Switchgrass Solar 1Solar · 20.0 MW · suspended
- TasleyOther · 6.7 MW · built
- Solar project AD2-032, Accomack CountySolar · 150 MW · withdrawn
- Solar project AE2-328, Accomack CountySolar · 100 MW · withdrawn
- Solar project AG2-258, Accomack CountySolar · 100 MW · withdrawn
- Onshore wind project Y1-029, Accomack CountyOnshore wind · 99.0 MW · withdrawn
- Onshore wind project W3-054A, Accomack CountyOnshore wind · 95.0 MW · withdrawn
- Solar project AE2-233, Accomack CountySolar · 94.0 MW · withdrawn
- Solar project AE1-073, Accomack CountySolar · 75.0 MW · withdrawn
- Solar project AE1-192, Accomack CountySolar · 70.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem