BATTERY STORAGE · PJMBattery storage project AH2-050, Accomack County
Battery storage project AH2-050, Accomack County is a 20.0 MW battery storage request in interconnection study in the PJM interconnection queue, in Accomack County, Virginia, connecting to ODEC.
Queue statusIn planning
- PlanningQueued Dec 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AH2-050
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ODEC
- Connection point (POI)
- Tasley 69kV
- Location
- Accomack County, Virginia
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 19 December 2021
- Proposed online date
- June 2025
Location
Marker shows the centre of Accomack County; the queue data does not give exact sites.
Other requests in Accomack County
- Switchgrass Solar 1Solar · 49.0 MW · suspended
- Switchgrass Solar 1Solar · 20.0 MW · suspended
- Scout Storage IBattery storage · 9.0 MW · suspended
- TasleyOther · 6.7 MW · built
- Solar project AD2-032, Accomack CountySolar · 150 MW · withdrawn
- Solar project AE2-328, Accomack CountySolar · 100 MW · withdrawn
- Solar project AG2-258, Accomack CountySolar · 100 MW · withdrawn
- Onshore wind project Y1-029, Accomack CountyOnshore wind · 99.0 MW · withdrawn
- Onshore wind project W3-054A, Accomack CountyOnshore wind · 95.0 MW · withdrawn
- Solar project AE2-233, Accomack CountySolar · 94.0 MW · withdrawn
- Solar project AE1-073, Accomack CountySolar · 75.0 MW · withdrawn
- Solar project AE1-192, Accomack CountySolar · 70.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem