United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSwitchgrass Solar 1
Switchgrass Solar 1 is a 20.0 MW solar request suspended in the PJM interconnection queue, in Accomack County, Virginia, connecting to Dominion.
Queue statusPaused / redesign
- PlanningQueued Feb 2020 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AF2-110
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Suffolk 115 kV
- Location
- Accomack County, Virginia
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Suspended
- Entered queue
- 27 February 2020
- Proposed online date
- October 2025
Location
Marker shows the centre of Accomack County; the queue data does not give exact sites.
Other requests in Accomack County
- Battery storage project AH2-050, Accomack CountyBattery storage Β· 20.0 MW Β· in study
- Switchgrass Solar 1Solar Β· 49.0 MW Β· suspended
- Scout Storage IBattery storage Β· 9.0 MW Β· suspended
- TasleyOther Β· 6.7 MW Β· built
- Solar project AD2-032, Accomack CountySolar Β· 150 MW Β· withdrawn
- Solar project AE2-328, Accomack CountySolar Β· 100 MW Β· withdrawn
- Solar project AG2-258, Accomack CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project Y1-029, Accomack CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Onshore wind project W3-054A, Accomack CountyOnshore wind Β· 95.0 MW Β· withdrawn
- Solar project AE2-233, Accomack CountySolar Β· 94.0 MW Β· withdrawn
- Solar project AE1-073, Accomack CountySolar Β· 75.0 MW Β· withdrawn
- Solar project AE1-192, Accomack CountySolar Β· 70.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem