πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

ONSHORE WIND Β· PJM

Onshore wind project W3-054A, Accomack County

Onshore wind project W3-054A, Accomack County is a 95.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Accomack County, Virginia, connecting to ODEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2010 (completed)
  2. Withdrawn / abandonedJan 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
W3-054A
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ODEC
Connection point (POI)
Oak Hall 138kV
Location
Accomack County, Virginia
Technology
Wind: 95.0 MW
Total requested
95.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
31 August 2010
Proposed online date
June 2013
Withdrawn
January 2013

Location

Marker shows the centre of Accomack County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Accomack County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem