United States › Grid › Interconnection queues › Illinois

BATTERY STORAGE · PJM

Aurora Battery Storage

Aurora Battery Storage is a 10.0 MW battery storage request suspended in the PJM interconnection queue, in Will County, Illinois, connecting to ComEd.

Queue statusPaused / redesign
  1. PlanningQueued Oct 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AG1-513
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Aurora 138 kV
Location
Will County, Illinois
Technology
Battery: 10.0 MW
Total requested
10.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Suspended
Entered queue
1 October 2020
Proposed online date
June 2028

Location

Marker shows the centre of Will County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Will County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem