OTHER Β· MISO

Surplus; J903

Surplus; J903 is a 30.0 MW other request in interconnection study in the MISO interconnection queue.

Queue statusIn planning
  1. PlanningQueued Oct 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1004
Grid region
MISO (Midcontinent)
Technology
Other: 30.0 MW Β· Battery
Total requested
30.0 MW
Queue status
Active
Entered queue
28 October 2020

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem