BATTERY STORAGE · PJM

Top Crop Generating Facility

Top Crop Generating Facility is a 50.0 MW battery storage request in interconnection study in the PJM interconnection queue, in Lasalle County, Illinois, connecting to ComEd.

Queue statusIn planning
  1. PlanningQueued Mar 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AF2-226
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Developer
Blackstone Wind Farm, LLC
Connection point (POI)
Katydid Road 345 kV
Location
Lasalle County, Illinois
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Active
Entered queue
26 March 2020
Proposed online date
October 2023

Location

Marker shows the centre of Lasalle County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Lasalle County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem