United States › Grid › Interconnection queues › Illinois
BATTERY STORAGE · PJMGrand Ridge Battery Storage
Grand Ridge Battery Storage is a 4.5 MW battery storage request built and operating in the PJM interconnection queue, in Lasalle County, Illinois, connecting to ComEd.
Request details
- Queue ID
- Y2-043
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Kickapoo
- Location
- Lasalle County, Illinois
- Technology
- Battery: 4.5 MW
- Total requested
- 4.5 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 30 July 2012
- Proposed online date
- December 2012
- Came online
- December 2012
Location
Marker shows the centre of Lasalle County; the queue data does not give exact sites.
Other requests in Lasalle County
- Osagrove Flats WindOnshore wind · 150 MW · agreement signed
- Nuclear project AH1-714, Lasalle CountyNuclear · 174 MW · in study
- Osagrove Flats SolarSolar · 150 MW · in study
- Otter Creek SolarSolar · 150 MW · in study
- Battery storage project AG2-061, Lasalle CountyBattery storage · 50.0 MW · in study
- Top Crop Generating FacilityBattery storage · 50.0 MW · in study
- Top Crop Generating FacilityBattery storage · 50.0 MW · in study
- Grand Ridge WFOnshore wind · 191 MW · built
- Grand Ridge Energy LLCOnshore wind · 150 MW · built
- LaSalle Nuclear Station Unit 1Nuclear · 20.0 MW · built
- LaSalle Nuclear Station Unit 2Nuclear · 20.0 MW · built
- Onshore wind project S62, Lasalle CountyOnshore wind · 500 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem