United States › Grid › Interconnection queues › Illinois
BATTERY STORAGE · PJMBattery storage project AG2-061, Lasalle County
Battery storage project AG2-061, Lasalle County is a 50.0 MW battery storage request in interconnection study in the PJM interconnection queue, in Lasalle County, Illinois, connecting to ComEd.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AG2-061
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Developer
- Aurora Solar LLC
- Connection point (POI)
- Powerton-Nevada 345 kV
- Location
- Lasalle County, Illinois
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 14 March 2025
- Proposed online date
- December 2023
Location
Marker shows the centre of Lasalle County; the queue data does not give exact sites.
Other requests in Lasalle County
- Osagrove Flats WindOnshore wind · 150 MW · agreement signed
- Nuclear project AH1-714, Lasalle CountyNuclear · 174 MW · in study
- Osagrove Flats SolarSolar · 150 MW · in study
- Otter Creek SolarSolar · 150 MW · in study
- Top Crop Generating FacilityBattery storage · 50.0 MW · in study
- Top Crop Generating FacilityBattery storage · 50.0 MW · in study
- Grand Ridge WFOnshore wind · 191 MW · built
- Grand Ridge Energy LLCOnshore wind · 150 MW · built
- LaSalle Nuclear Station Unit 1Nuclear · 20.0 MW · built
- LaSalle Nuclear Station Unit 2Nuclear · 20.0 MW · built
- Grand Ridge Battery StorageBattery storage · 4.5 MW · built
- Onshore wind project S62, Lasalle CountyOnshore wind · 500 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem