SOLAR · PJM

Jarratt Energy Facility 2

Jarratt Energy Facility 2 is a 18.0 MW solar request in interconnection study in the PJM interconnection queue, in Greensville County, Virginia, connecting to Dominion.

Queue statusIn planning
  1. PlanningQueued Mar 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2022 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AF2-299
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Developer
Jarratt Energy Facility, LLC
Connection point (POI)
Fields 34.5 kV
Location
Greensville County, Virginia
Technology
Solar: 18.0 MW
Total requested
18.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Active
Entered queue
30 March 2020
Proposed online date
December 2022

Location

Marker shows the centre of Greensville County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Greensville County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem