United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in Texas — page 5
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Nebula Solar Solar · Rayos Del Sol Solar Project, LLC |
138 MW | |
| Strategic Solar 1 Solar · Elm Branch Solar 1, LLC |
137 MW | |
| Blue Summit I Repower Wind + storage |
135 MW | |
| Elara Solar Solar · Elara Energy Project, LLC |
132 MW | |
| Giga Texas Energy Storage Other · Giga Texas Energy, LLC. |
131 MW | |
| Orange Grove Solar Solar + storage · Enbridge Solar (Orange Grove), LLC |
131 MW | |
| Vision Solar 1 Solar · Briar Creek Solar 1, LLC |
129 MW | |
| Anchor Wind II Onshore wind |
129 MW | |
| Roadrunner Crossing Wind SLF Wind + storage · Roadrunner Crossing Wind Farm, LLC |
128 MW | |
| Roadrunner Crossing Wind II SLF Onshore wind · Roadrunner Crossing Wind Farm, LLC |
127 MW | |
| Coniglio Solar Solar · BT Coniglio Solar, LLC |
126 MW | |
| Connolly Storage Other · BT Connolly Storage, LLC |
125 MW | |
| Wigeon Whistle BESS Other · Wigeon Whistle BESS |
123 MW | |
| Vortex BESS Other · AZURE SKY WIND STORAGE LLC |
122 MW | |
| Black Springs BESS Battery storage · Black Springs BESS LLC |
121 MW | |
| Wagyu Solar Solar · Cypress Creek Renewables |
120 MW | |
| Maverick Creek II Wind Onshore wind · Maverick Creek Wind, LLC |
119 MW | |
| BlueBell Solar II Solar · Bluebell Solar |
115 MW | |
| Galloway 2 Solar Solar · 224WB 8me LLC |
114 MW | |
| Emerald Grove Solar Solar · Emerald Grove Solar, LLC |
108 MW | |
| Limousin Oak Storage Other · KCE TX 15, LLC |
105 MW | |
| Silicon Hill Storage Other · KCE TX 12, LLC |
105 MW | |
| Hummingbird Storage Other · KCE TX 10, LLC |
104 MW | |
| Bright Arrow Storage Other · RWE Solar Development, LLC |
104 MW | |
| Burksol BESS Other · Burksol LLC |
103 MW | |
| Spanish Crown Solar · BPL Crown Solar |
103 MW | |
| Al Pastor BESS Other · Al Pastor BESS LLC |
103 MW | |
| Great Kiskadee Storage Battery storage · Great Kiskadee Storage, LLC |
103 MW | |
| Golinda Solar Solar · BPL Sol Solar |
103 MW | |
| Angelo Storage Other · Angelo Storage, LLC |
103 MW | |
| St. Gall I Energy Storage Other · St. Gall Energy Storage I LLC |
103 MW | |
| Gambit Batt Other · Gambit Energy Storage |
102 MW | |
| Brotman II Power Station Gas · Brotman II, LLC |
102 MW | |
| Remy Jade II Unit 7 Unit 8 Power Station Gas · Remy Jade II, LLC |
102 MW | |
| Beachwood II Power Station Gas · Mark One II LLC |
102 MW | |
| PES 2 Power Station Gas · HO CLARKE GENERATING LLC |
102 MW | |
| RABBS U7 U8 Power Station Gas |
102 MW | |
| Brotman U1 U2 Power Station Gas |
102 MW | |
| Rowland Solar I Solar · Cutlass Solar LLC |
102 MW | |
| Grizzly Ridge Solar Solar + storage · Grizzly Ridge Solar LLC |
102 MW | |
| Chisholm Grid Other · Chisholm Grid, LLC |
102 MW | |
| Estonian Storage Other |
102 MW | |
| River Bend Other · Brazos Bend BESS LLC |
102 MW | |
| Madero Unit2 Other · Ignacio Grid, LLC |
102 MW | |
| Madero Grid Other · Madero Grid, LLC |
102 MW | |
| Sun Valley BESS Other · Sun Valley Solar LLC |
101 MW | |
| Karankawa 2 Wind Onshore wind · Avangrid |
101 MW | |
| Swoose II Other · Swoose II, LLC |
101 MW | |
| Flower Valley II Batt Other · Flower Valley II, LLC |
101 MW | |
| Lucky Bluff BESS SLF Battery storage · Lucky Bluff BESS LLC |
101 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)397 · 53.8 GW
- SPP (Southwest Power Pool)30 · 4,859 MW
- MISO (Midcontinent)3 · 1,246 MW
- West (non-ISO utilities)1 · 420 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)