United States › Grid › Interconnection queues › Texas

GAS · ERCOT

Brotman II Power Station

Brotman II Power Station is a 102 MW gas request built and operating in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusOperating
  1. Planning (completed)
  2. ConsentedJun 2022 (completed)
  3. Construction (completed)
  4. OperatingOct 2023 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
23INR0551
Grid region
ERCOT (Texas)
Developer
Brotman II, LLC
Connection point (POI)
tap 138kV Rosharon 44600 – 44440 Manvel. CNP station -138kV Archer Station (#42570)
Location
Brazoria County, Texas
Technology
Gas: 102 MW
Total requested
102 MW
Study phase
IA
Queue status
Operational
Agreement signed
14 June 2022
Proposed online date
November 2023
Came online
October 2023

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem