| Project | Capacity | Status |
|---|---|---|
| Warthan Creek Solar Project Solar |
20.0 MW | Withdrawn / abandoned |
| El Peco Solar Farm Solar |
20.0 MW | Withdrawn / abandoned |
| Vea Homestead Solar |
20.0 MW | Withdrawn / abandoned |
| World Sun PV Project Solar |
20.0 MW | Withdrawn / abandoned |
| Rosamond Solar Facility Solar |
20.0 MW | Withdrawn / abandoned |
| San Joaquin 2B Solar |
20.0 MW | Withdrawn / abandoned |
| Sanborn Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Luna Prism (Fka: Moon Prism 2) Battery storage |
19.9 MW | Withdrawn / abandoned |
| Maddox Dairy Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Afton Canyon PV Solar |
19.9 MW | Withdrawn / abandoned |
| Great Valley Solar Solar |
19.7 MW | Withdrawn / abandoned |
| Clearvista Energy Onshore wind |
19.5 MW | Withdrawn / abandoned |
| Costa Solar |
19.2 MW | Withdrawn / abandoned |
| Thunderhill Solar Power Unit 2 Solar |
18.0 MW | Withdrawn / abandoned |
| Kernridge Expansion Solar |
17.9 MW | Withdrawn / abandoned |
| Giffen 1 Solar |
17.9 MW | Withdrawn / abandoned |
| Bio Verde PV - Kettleman 2 Solar |
17.8 MW | Withdrawn / abandoned |
| Sun Brilliance Solar |
16.4 MW | Withdrawn / abandoned |
| Renegy Ione Gas |
16.3 MW | Withdrawn / abandoned |
| Ocotillo Express Phase II Onshore wind |
16.1 MW | Withdrawn / abandoned |
| Liberty V Lost Hills Other |
16.0 MW | Withdrawn / abandoned |
| White Ranch District Solar Project Solar |
16.0 MW | Withdrawn / abandoned |
| STS Solar Solar |
16.0 MW | Withdrawn / abandoned |
| High Desert Solar Solar |
16.0 MW | Withdrawn / abandoned |
| Raspberry Solar 1 Solar |
15.6 MW | Withdrawn / abandoned |
| Lake Clementine Hydroelectric Hydro |
15.5 MW | Withdrawn / abandoned |
| Lake Clementine Hydroelectric C7 Hydro |
15.5 MW | Withdrawn / abandoned |
| Tierra Del Sol II Solar |
15.0 MW | Withdrawn / abandoned |
| Sierra View Solar III Solar |
15.0 MW | Withdrawn / abandoned |
| Indeck Yuba Energy Center Solar |
15.0 MW | Withdrawn / abandoned |
| Coso #2 Geothermal |
15.0 MW | Withdrawn / abandoned |
| Bio Verde PV - Vlot Solar |
15.0 MW | Withdrawn / abandoned |
| Coso #3 Geothermal |
15.0 MW | Withdrawn / abandoned |
| Gaugamela Solar |
15.0 MW | Withdrawn / abandoned |
| Tracy Desalination And Green Energy Project Other |
15.0 MW | Withdrawn / abandoned |
| Bio Verde PV - Kettleman 1 Solar |
15.0 MW | Withdrawn / abandoned |
| Watt Energy Storage Battery storage |
15.0 MW | Withdrawn / abandoned |
| Coso #1 Geothermal |
15.0 MW | Withdrawn / abandoned |
| Wellhead Renewables Fresno Gas |
14.5 MW | Withdrawn / abandoned |
| East Lancaster Power Plant Solar |
14.0 MW | Withdrawn / abandoned |
| Tres Vaqueros Wind Farm Onshore wind |
14.0 MW | Withdrawn / abandoned |
| Camden 1 Solar |
14.0 MW | Withdrawn / abandoned |
| Ta-East Lancaster Solar |
14.0 MW | Withdrawn / abandoned |
| Peabody Jac Solar |
14.0 MW | Withdrawn / abandoned |
| Jacobs Corner Solar Solar |
13.5 MW | Withdrawn / abandoned |
| Wellfield Solar Solar |
13.4 MW | Withdrawn / abandoned |
| Three Rocks Solar Solar |
13.0 MW | Withdrawn / abandoned |
| Township Power Bank Expansion Gas |
12.3 MW | Withdrawn / abandoned |
| Chestnut Storage Solar + storage |
12.0 MW | Withdrawn / abandoned |
| Sepv-15 Solar |
12.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)