United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Sepv-15

Sepv-15 is a 12.0 MW solar request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2010 (completed)
  2. Withdrawn / abandonedJan 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
638A
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Coalinga CoGen 70 kV Tap & Tornado Dist
Location
Fresno County, California
Technology
Solar: 12.0 MW
Total requested
12.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
9 July 2010
Proposed online date
December 2011
Withdrawn
January 2011

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.