United States › Grid › Interconnection queues › California

SOLAR · CAISO

Afton Canyon PV

Afton Canyon PV is a 19.9 MW solar request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2008 (completed)
  2. Withdrawn / abandonedAug 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
474
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Dunn Siding Substation
Location
San Bernardino County, California
Technology
Solar: 19.9 MW
Total requested
19.9 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 September 2008
Proposed online date
June 2011
Withdrawn
August 2011

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem