Tracy Desalination And Green Energy Project

Tracy Desalination And Green Energy Project is a 15.0 MW other request withdrawn in the CAISO interconnection queue, in San Joaquin County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2012 (completed)
  2. Withdrawn / abandonedJul 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
886
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Tracy-Tesla 115kV line
Location
San Joaquin County, California
Technology
Other: 15.0 MW
Total requested
15.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 April 2012
Proposed online date
August 2014
Withdrawn
July 2012

Location

Marker shows the centre of San Joaquin County; the queue data does not give exact sites.