United States › Grid › Interconnection queues › California
BATTERY STORAGE · CAISOWatt Energy Storage
Watt Energy Storage is a 15.0 MW battery storage request withdrawn in the CAISO interconnection queue, in Solano County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2014 (completed)
- Withdrawn / abandonedJan 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1025
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Jameson Substation 115 kV
- Location
- Solano County, California
- Technology
- Battery: 15.0 MW
- Total requested
- 15.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 April 2014
- Proposed online date
- January 2017
- Withdrawn
- January 2015
Location
Marker shows the centre of Solano County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Solano County
- CorbyBattery storage · 314 MW · agreement signed
- Montezuma IIWind + storage · 132 MW · agreement signed
- Solano 4 WindOnshore wind · 92.4 MW · agreement signed
- Montezuma (High Winds III)Wind + storage · 76.0 MW · agreement signed
- Corby 2Battery storage · 476 MW · in study
- TolenasBattery storage · 417 MW · in study
- BrushyBattery storage · 400 MW · in study
- High Winds StorageBattery storage · 121 MW · in study
- Toland Renewable Energy ParkOnshore wind · 108 MW · in study
- Arges BESSBattery storage · 102 MW · in study
- Shiloh IIIOnshore wind · 200 MW · built
- Shiloh Wind Farm IIOnshore wind · 150 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem