United States › Grid › Interconnection queues › California
HYDRO · CAISOLake Clementine Hydroelectric C7
Lake Clementine Hydroelectric C7 is a 15.5 MW hydro request withdrawn in the CAISO interconnection queue, in Placer County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2014 (completed)
- Withdrawn / abandonedFeb 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1013
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Halsey Substation 60 kV
- Location
- Placer County, California
- Technology
- Hydro: 15.5 MW
- Total requested
- 15.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 April 2014
- Proposed online date
- January 2018
- Withdrawn
- February 2015
Location
Marker shows the centre of Placer County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Placer County
- Osito EnergySolar + storage · 613 MW · withdrawn
- Placer Solar PV ISolar · 220 MW · withdrawn
- Timber Energy StorageBattery storage · 214 MW · withdrawn
- Rocklin PeakerGas · 117 MW · withdrawn
- Meadows Energy StorageBattery storage · 102 MW · withdrawn
- Riosa Central SolarSolar · 20.2 MW · withdrawn
- Pleasant Grove Grid Stabilization ProjectBattery storage · 20.0 MW · withdrawn
- Lake Clementine HydroelectricHydro · 15.5 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem