United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Riosa Central Solar

Riosa Central Solar is a 20.2 MW solar request withdrawn in the CAISO interconnection queue, in Placer County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedMar 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1361
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Smartville-Camp Far West 60kV line
Location
Placer County, California
Technology
Solar: 20.2 MW
Total requested
20.2 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
November 2020
Withdrawn
March 2018

Location

Marker shows the centre of Placer County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Placer County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem