SOLAR Β· CAISO

Placer Solar PV I

Placer Solar PV I is a 220 MW solar request withdrawn in the CAISO interconnection queue, in Placer County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2010 (completed)
  2. Withdrawn / abandonedMay 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
643F
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Rio Oso-Lockford 230 kV
Location
Placer County, California
Technology
Solar: 220 MW
Total requested
220 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 July 2010
Proposed online date
March 2014
Withdrawn
May 2013

Location

Marker shows the centre of Placer County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Placer County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem