United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Timber Energy Storage

Timber Energy Storage is a 214 MW battery storage request withdrawn in the CAISO interconnection queue, in Placer County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedDec 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1901
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Atlantic Substation 230 kV
Location
Placer County, California
Technology
Battery: 214 MW
Total requested
214 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
June 2024
Withdrawn
December 2022

Location

Marker shows the centre of Placer County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Placer County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem