🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

HYDRO · CAISO

Lake Clementine Hydroelectric

Lake Clementine Hydroelectric is a 15.5 MW hydro request withdrawn in the CAISO interconnection queue, in Placer County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2013 (completed)
  2. Withdrawn / abandonedApr 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
962
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Halsey Substation 60Kv
Location
Placer County, California
Technology
Hydro: 15.5 MW
Total requested
15.5 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2013
Proposed online date
January 2017
Withdrawn
April 2014

Location

Marker shows the centre of Placer County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Placer County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem