GAS Β· CAISOTownship Power Bank Expansion
Township Power Bank Expansion is a 12.3 MW gas request withdrawn in the CAISO interconnection queue, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 54783
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- GREENLEAF #1 TAP
- Location
- California
- Technology
- Gas: 11.3 MW Β· Battery: 1.0 MW
- Total requested
- 12.3 MW
- Service type
- Network resource (NRIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- June 2028
- Withdrawn
- December 2024
Location
Marker shows the centre of County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in County
- Whiskey DiggingsSolar Β· 414 MW Β· in study
- Township Power BankBattery storage Β· 50.5 MW Β· in study
- Verbena Energy StorageBattery storage Β· 50.5 MW Β· in study
- Sutter Energy CenterGas Β· 600 MW Β· withdrawn
- Sutter Energy Center 2Gas Β· 600 MW Β· withdrawn
- Palermo Generating StationGas Β· 345 MW Β· withdrawn
- Rio Oso Generating StationGas Β· 325 MW Β· withdrawn
- Solar + storage project 2022-G1, Sutter CountySolar + storage Β· 300 MW Β· withdrawn
- Blue BirdSolar + storage Β· 232 MW Β· withdrawn
- Spindrift Hybrid SolarSolar + storage Β· 204 MW Β· withdrawn
- Spartan Energy StorageBattery storage Β· 152 MW Β· withdrawn
- Tierra Buena Energy CenterBattery storage Β· 74.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem