United States › Grid › Interconnection queues › California
ONSHORE WIND · CAISOTres Vaqueros Wind Farm
Tres Vaqueros Wind Farm is a 14.0 MW onshore wind request withdrawn in the CAISO interconnection queue, in Contra Costa County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2008 (completed)
- Withdrawn / abandonedDec 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 417
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Pittsburg-Tesla 230kV line
- Location
- Contra Costa County, California
- Technology
- Wind: 14.0 MW
- Total requested
- 14.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 May 2008
- Proposed online date
- May 2015
- Withdrawn
- December 2013
Location
Marker shows the centre of Contra Costa County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Contra Costa County
- Steel City Battery StorageBattery storage · 675 MW · agreement signed
- Delilah Energy StorageBattery storage · 504 MW · agreement signed
- Allegheny Energy StorageBattery storage · 353 MW · agreement signed
- Black Diamond ES2Battery storage · 179 MW · agreement signed
- Harmony Storage 2Battery storage · 308 MW · in study
- Sherman Energy StorageBattery storage · 256 MW · in study
- Gateway Generating Facility (Fka Contra Costa Power Plant Project)Gas · 590 MW · built
- Black Diamond Energy StorageBattery storage · 200 MW · built
- Marsh Landing Generation Station - Simple Cycle UnitsGas · 100 MW · built
- Los Medanos Energy CenterGas · 72.0 MW · built
- Buena Vista RepowerOnshore wind · 37.5 MW · built
- Columbia Solar Energy 2 Fka Columbia Solar Energy IISolar · 20.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem