United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

STS Solar

STS Solar is a 16.0 MW solar request withdrawn in the CAISO interconnection queue, in Sonoma County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2013 (completed)
  2. Withdrawn / abandonedJun 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
997
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Monte Rio-Fulton 60 kV transmission line
Location
Sonoma County, California
Technology
Solar: 16.0 MW
Total requested
16.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2013
Proposed online date
September 2015
Withdrawn
June 2015

Location

Marker shows the centre of Sonoma County; the queue data does not give exact sites.