United States › Grid › Interconnection queues › California
BATTERY STORAGE · CAISONorth Bay Energy Storage
North Bay Energy Storage is a 103 MW battery storage request withdrawn in the CAISO interconnection queue, in Sonoma County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedNov 2024 (project stopped here)
- ConsentedNov 2023 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1700
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Lakeville 60 kV
- Location
- Sonoma County, California
- Technology
- Battery: 103 MW
- Total requested
- 103 MW
- Service type
- Energy only (ERIS)
- Study phase
- Executed
- Queue status
- Withdrawn
- Entered queue
- 15 April 2020
- Agreement signed
- 22 November 2023
- Proposed online date
- March 2027
- Withdrawn
- November 2024
Location
Marker shows the centre of Sonoma County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Sonoma County
- Wildhorse Energy CenterBattery storage · 122 MW · in study
- Mayacamas GeothermalGeothermal · 53.0 MW · in study
- Borealis Energy StorageBattery storage · 314 MW · withdrawn
- MyrtleSolar + storage · 216 MW · withdrawn
- Blitz Energy StorageBattery storage · 214 MW · withdrawn
- Brix Energy StorageBattery storage · 214 MW · withdrawn
- North Bay Energy Storage 2Battery storage · 102 MW · withdrawn
- Pintail Energy StorageBattery storage · 100 MW · withdrawn
- New GeysersGeothermal · 50.0 MW · withdrawn
- CPN Wild Horse GeothermalGeothermal · 42.0 MW · withdrawn
- Kuiper Energy StorageBattery storage · 40.5 MW · withdrawn
- WGP GeysersGeothermal · 35.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem