Brix Energy Storage

Brix Energy Storage is a 214 MW battery storage request withdrawn in the CAISO interconnection queue, in Sonoma County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedMay 2024 (project stopped here)
  3. ConsentedMay 2022 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1836
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Fulton 115 kV
Location
Sonoma County, California
Technology
Battery: 214 MW
Total requested
214 MW
Service type
Energy only (ERIS)
Study phase
Terminated
Queue status
Withdrawn
Entered queue
19 April 2021
Agreement signed
30 May 2022
Proposed online date
June 2027
Withdrawn
May 2024

Location

Marker shows the centre of Sonoma County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Sonoma County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem