🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Borealis Energy Storage

Borealis Energy Storage is a 314 MW battery storage request withdrawn in the CAISO interconnection queue, in Sonoma County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedAug 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1838
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Lakeville 115 kV
Location
Sonoma County, California
Technology
Battery: 314 MW
Total requested
314 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
June 2030
Withdrawn
August 2025

Location

Marker shows the centre of Sonoma County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Sonoma County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem