Kuiper Energy Storage

Kuiper Energy Storage is a 40.5 MW battery storage request withdrawn in the CAISO interconnection queue, in Sonoma County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedFeb 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1538
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Geysers #3 Cloverdale 115 kV line
Location
Sonoma County, California
Technology
Battery: 40.5 MW
Total requested
40.5 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
5 April 2019
Proposed online date
December 2021
Withdrawn
February 2020

Location

Marker shows the centre of Sonoma County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Sonoma County