United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR Β· CAISOBio Verde PV - Vlot
Bio Verde PV - Vlot is a 15.0 MW solar request withdrawn in the CAISO interconnection queue, in Madera County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2010 (completed)
- Withdrawn / abandonedNov 2010 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 597
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Merced #1 70 kV line (El Nido Bonita segment)
- Location
- Madera County, California
- Technology
- Solar: 15.0 MW
- Total requested
- 15.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 1 February 2010
- Proposed online date
- December 2012
- Withdrawn
- November 2010
Location
Marker shows the centre of Madera County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Madera County
- Lotus Solar 2Solar + storage Β· 406 MW Β· in study
- GaladrielBattery storage Β· 318 MW Β· in study
- Puma StorageBattery storage Β· 204 MW Β· in study
- Flores StorageBattery storage Β· 152 MW Β· in study
- Valetudo Energy StorageBattery storage Β· 79.6 MW Β· in study
- Lotus Solar FarmSolar Β· 50.0 MW Β· built
- Chowchilla Solar ProjectSolar Β· 20.0 MW Β· built
- Chowchilla BiomassOther Β· 10.5 MW Β· built
- Spectrum Energy Storage 2Battery storage Β· 566 MW Β· withdrawn
- Delilah Energy Storage 2Battery storage Β· 300 MW Β· withdrawn
- TrigoSolar + storage Β· 230 MW Β· withdrawn
- IrrigosaSolar + storage Β· 230 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem