United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

High Desert Solar

High Desert Solar is a 16.0 MW solar request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedMar 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
785
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Silver Queen-Goldtown 69kV line
Location
Kern County, California
Technology
Solar: 16.0 MW
Total requested
16.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
January 2013
Withdrawn
March 2012

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem