United States › Grid › Interconnection queues › California

SOLAR · CAISO

Thunderhill Solar Power Unit 2

Thunderhill Solar Power Unit 2 is a 18.0 MW solar request withdrawn in the CAISO interconnection queue, in Glenn County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedApr 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
773
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Elk Creek 60 KV Tap
Location
Glenn County, California
Technology
Solar: 18.0 MW
Total requested
18.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
June 2013
Withdrawn
April 2012

Location

Marker shows the centre of Glenn County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Glenn County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem