United States › Grid › Interconnection queues › California

SOLAR · CAISO

Thunderhill Solar Power

Thunderhill Solar Power is a 20.0 MW solar request withdrawn in the CAISO interconnection queue, in Glenn County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2010 (completed)
  2. Withdrawn / abandonedJul 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
642
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Elk Creek 60kV Tap
Location
Glenn County, California
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 July 2010
Proposed online date
July 2011
Withdrawn
July 2012

Location

Marker shows the centre of Glenn County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Glenn County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem