GAS · CAISOWellhead Power Logan Creek
Wellhead Power Logan Creek is a 49.0 MW gas request withdrawn in the CAISO interconnection queue, in Glenn County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2008 (completed)
- Withdrawn / abandonedNov 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 374
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Tap Cottonwood-Logan Creek-Vaca Dixon 230kV line
- Location
- Glenn County, California
- Technology
- Gas: 49.0 MW
- Total requested
- 49.0 MW
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 27 May 2008
- Proposed online date
- June 2010
- Withdrawn
- November 2008
Location
Marker shows the centre of Glenn County; the queue data does not give exact sites.