United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Ocotillo Express Phase II

Ocotillo Express Phase II is a 16.1 MW onshore wind request withdrawn in the CAISO interconnection queue, in Imperial County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2010 (completed)
  2. Withdrawn / abandonedDec 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
643AP
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Sunrise Powerlink 500 kV
Location
Imperial County, California
Technology
Wind: 16.1 MW
Total requested
16.1 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 July 2010
Proposed online date
December 2013
Withdrawn
December 2012

Location

Marker shows the centre of Imperial County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Imperial County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem