United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 4
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Muscat Battery storage |
772 MW | Withdrawn / abandoned |
| Central Coast Wind 1 Onshore wind |
772 MW | Withdrawn / abandoned |
| Trilobite Solar Project Solar |
750 MW | Withdrawn / abandoned |
| Palomas Solar Solar |
750 MW | Withdrawn / abandoned |
| Palo Verde Mesa (Fka Brightsource Midpoint Solar) Solar |
750 MW | Withdrawn / abandoned |
| San Diego Community Power Generating Station Gas |
750 MW | Withdrawn / abandoned |
| California City Solar Solar |
732 MW | Withdrawn / abandoned |
| Fairfield Energy Center - 730 MW Gas |
730 MW | Withdrawn / abandoned |
| Gigantes Solar Solar |
730 MW | Withdrawn / abandoned |
| Bpae Kern Front Gas |
725 MW | Withdrawn / abandoned |
| Copper Rays Solar |
722 MW | Withdrawn / abandoned |
| Cathedral Solar + storage |
722 MW | Withdrawn / abandoned |
| Icarus Wind and Solar Solar + storage |
719 MW | Withdrawn / abandoned |
| Bradmoor Solar Solar + storage |
719 MW | Withdrawn / abandoned |
| Bright Star Hybrid Solar + storage |
719 MW | Withdrawn / abandoned |
| Sur Vista Solar + storage |
718 MW | Withdrawn / abandoned |
| Juglans Energy Storage Battery storage |
711 MW | Withdrawn / abandoned |
| Adastra Hybrid Solar Solar + storage |
709 MW | Withdrawn / abandoned |
| Mesaville Solar Solar + storage |
706 MW | Withdrawn / abandoned |
| Onyx Solar + storage |
706 MW | Withdrawn / abandoned |
| Rock Dove 1 Energy Center Solar + storage |
701 MW | Withdrawn / abandoned |
| Rock Dove 2 Energy Center Solar + storage |
701 MW | Withdrawn / abandoned |
| Santa Ana Energy Center Gas |
700 MW | Withdrawn / abandoned |
| Blythe III Gas |
700 MW | Withdrawn / abandoned |
| PV-49 Solar |
700 MW | Withdrawn / abandoned |
| CVH Power II Solar |
700 MW | Withdrawn / abandoned |
| PV-47 Solar |
700 MW | Withdrawn / abandoned |
| PV-48 Solar |
700 MW | Withdrawn / abandoned |
| Desert Quartzsite PV Solar |
700 MW | Withdrawn / abandoned |
| Etiwanda CCGT Gas |
698 MW | Withdrawn / abandoned |
| City Of Vernon Renewable Project 1 Onshore wind |
688 MW | Withdrawn / abandoned |
| Edison Drive Energy Storage Battery storage |
672 MW | Withdrawn / abandoned |
| Sunstone Solar + storage |
672 MW | Withdrawn / abandoned |
| Huxley Solar Solar + storage |
671 MW | Withdrawn / abandoned |
| Bryon Highway Power Bank Gas |
663 MW | Withdrawn / abandoned |
| Railway Power Bank Battery storage |
656 MW | Withdrawn / abandoned |
| McFarland D Solar + storage |
651 MW | Withdrawn / abandoned |
| Oakley Generating Station Gas |
651 MW | Withdrawn / abandoned |
| Ashanti Hybrid Solar Solar + storage |
650 MW | Withdrawn / abandoned |
| Morro Bay Wave Energy Project Other |
650 MW | Withdrawn / abandoned |
| Alta Q175 (Fka Alta 11) Onshore wind |
650 MW | Withdrawn / abandoned |
| Steel City Energy Storage Battery storage |
650 MW | Withdrawn / abandoned |
| Antioch Generating Station Gas |
650 MW | Withdrawn / abandoned |
| South Bay Replacement - Option 1 Gas |
650 MW | Withdrawn / abandoned |
| Ventus Renewable Energy Center Other |
643 MW | Withdrawn / abandoned |
| Blythe III (Revised) Gas |
640 MW | Withdrawn / abandoned |
| Pastoria Creek Power Bank Battery storage |
636 MW | Withdrawn / abandoned |
| Mojave Solar Park 1 Solar |
635 MW | Withdrawn / abandoned |
| Copper Mountain II Gas |
634 MW | Withdrawn / abandoned |
| Copper Mountain II Alternate Gas |
634 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)