United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 4

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 4 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Muscat
Battery storage
772 MWWithdrawn / abandoned CACAISO Apr 2021target 2024
Central Coast Wind 1
Onshore wind
772 MWWithdrawn / abandoned Santa Barbara, CACAISO Apr 2020target 2027
Trilobite Solar Project
Solar
750 MWWithdrawn / abandoned San Bernardino, CACAISO Dec 2007target 2012
Palomas Solar
Solar
750 MWWithdrawn / abandoned Yuma, AZCAISO Jul 2009target 2015
Palo Verde Mesa (Fka Brightsource Midpoint Solar)
Solar
750 MWWithdrawn / abandoned Riverside, CACAISO Jul 2010target 2015
San Diego Community Power Generating Station
Gas
750 MWWithdrawn / abandoned San Diego, CACAISO Nov 2000target 2010
California City Solar
Solar
732 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2020
Fairfield Energy Center - 730 MW
Gas
730 MWWithdrawn / abandoned Solano, CACAISO Jun 2008target 2012
Gigantes Solar
Solar
730 MWWithdrawn / abandoned Imperial, CACAISO May 2016target 2020
Bpae Kern Front
Gas
725 MWWithdrawn / abandoned Kern, CACAISO Apr 2007target 2013
Copper Rays
Solar
722 MWWithdrawn / abandoned Nye, NVCAISO May 2016target 2021
Cathedral
Solar + storage
722 MWWithdrawn / abandoned Nye, NVCAISO Apr 2023target 2031
Icarus Wind and Solar
Solar + storage
719 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Bradmoor Solar
Solar + storage
719 MWWithdrawn / abandoned Solano, CACAISO Apr 2019target 2022
Bright Star Hybrid
Solar + storage
719 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2019target 2022
Sur Vista
Solar + storage
718 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Juglans Energy Storage
Battery storage
711 MWWithdrawn / abandoned Solano, CACAISO Apr 2021target 2031
Adastra Hybrid Solar
Solar + storage
709 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2025
Mesaville Solar
Solar + storage
706 MWWithdrawn / abandoned Riverside, CACAISO May 2017target 2022
Onyx
Solar + storage
706 MWWithdrawn / abandoned Clark, NVCAISO Apr 2023target 2030
Rock Dove 1 Energy Center
Solar + storage
701 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Rock Dove 2 Energy Center
Solar + storage
701 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2025
Santa Ana Energy Center
Gas
700 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Blythe III
Gas
700 MWWithdrawn / abandoned Riverside, CACAISO Jan 2007target 2012
PV-49
Solar
700 MWWithdrawn / abandoned Kern, CACAISO May 2008target 2011
CVH Power II
Solar
700 MWWithdrawn / abandoned Maricopa, AZCAISO Mar 2011target 2014
PV-47
Solar
700 MWWithdrawn / abandoned Kern, CACAISO May 2008target 2011
PV-48
Solar
700 MWWithdrawn / abandoned Kern, CACAISO May 2008target 2013
Desert Quartzsite PV
Solar
700 MWWithdrawn / abandoned Riverside, CACAISO Nov 2007target 2015
Etiwanda CCGT
Gas
698 MWWithdrawn / abandoned San Bernardino, CACAISO Oct 2006target 2013
City Of Vernon Renewable Project 1
Onshore wind
688 MWWithdrawn / abandoned Kern, CACAISO Jul 2009target 2013
Edison Drive Energy Storage
Battery storage
672 MWWithdrawn / abandoned Ventura, CACAISO Apr 2021target 2024
Sunstone
Solar + storage
672 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Huxley Solar
Solar + storage
671 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2027
Bryon Highway Power Bank
Gas
663 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Railway Power Bank
Battery storage
656 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
McFarland D
Solar + storage
651 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Oakley Generating Station
Gas
651 MWWithdrawn / abandoned Contra Costa, CACAISO Sep 2007target 2020
Ashanti Hybrid Solar
Solar + storage
650 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2024
Morro Bay Wave Energy Project
Other
650 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2015target 2020
Alta Q175 (Fka Alta 11)
Onshore wind
650 MWWithdrawn / abandoned Kern, CACAISO Feb 2007target 2017
Steel City Energy Storage
Battery storage
650 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2019target 2025
Antioch Generating Station
Gas
650 MWWithdrawn / abandoned Contra Costa, CACAISO Nov 2007target 2012
South Bay Replacement - Option 1
Gas
650 MWWithdrawn / abandoned San Diego, CACAISO Feb 2004target 2010
Ventus Renewable Energy Center
Other
643 MWWithdrawn / abandoned Riverside, CACAISO Apr 2019target 2023
Blythe III (Revised)
Gas
640 MWWithdrawn / abandoned Riverside, CACAISO Jun 2007target 2015
Pastoria Creek Power Bank
Battery storage
636 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Mojave Solar Park 1
Solar
635 MWWithdrawn / abandoned San Bernardino, CACAISO May 2006target 2010
Copper Mountain II
Gas
634 MWWithdrawn / abandoned Clark, NVCAISO Jul 2007target 2011
Copper Mountain II Alternate
Gas
634 MWWithdrawn / abandoned Clark, NVCAISO Oct 2007target 2011
Page 4 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)