Bryon Highway Power Bank is a 663 MW gas request withdrawn in the CAISO interconnection queue, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 54788
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- TESLA 230 kV
- Location
- California
- Technology
- Gas: 662 MW Β· Battery: 1.0 MW
- Total requested
- 663 MW
- Service type
- Network resource (NRIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- January 2031
- Withdrawn
- December 2024
Location
Marker shows the centre of County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in County
- Spectrum Energy StorageBattery storage Β· 504 MW Β· agreement signed
- EspressoBattery storage Β· 365 MW Β· agreement signed
- Zorin StorageBattery storage Β· 252 MW Β· agreement signed
- Aramis Power PlantSolar + storage Β· 203 MW Β· agreement signed
- Reclaimed WindBattery storage Β· 114 MW Β· agreement signed
- Mulqueeney Ranch WindOnshore wind Β· 114 MW Β· agreement signed
- Sand Hill COnshore wind Β· 84.3 MW Β· agreement signed
- Mulqueeney Ranch Wind 2Onshore wind Β· 62.5 MW Β· agreement signed
- Altamont Midway LTDOnshore wind Β· 5.0 MW Β· agreement signed
- Tea Leaf Energy StorageBattery storage Β· 404 MW Β· in study
- Emerita Energy StorageBattery storage Β· 206 MW Β· in study
- Palmetto Energy StorageBattery storage Β· 75.6 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem