SOLAR + STORAGE · CAISO

Bright Star Hybrid

Bright Star Hybrid is a 719 MW solar + storage request withdrawn in the CAISO interconnection queue, in San Joaquin County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedApr 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1541
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Brighton-Bellota 230kV
Location
San Joaquin County, California
Technology
Solar: 362 MW · Battery: 357 MW
Total requested
719 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
December 2022
Withdrawn
April 2020

Location

Marker shows the centre of San Joaquin County; the queue data does not give exact sites.