Fairfield Energy Center - 730 MW

Fairfield Energy Center - 730 MW is a 730 MW gas request withdrawn in the CAISO interconnection queue, in Solano County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
452
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Loop Lakesville-Sobrante and Lakesville-Ignacio 230kV Lines
Location
Solano County, California
Technology
Gas: 730 MW
Total requested
730 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 June 2008
Proposed online date
June 2012
Withdrawn
November 2008

Location

Marker shows the centre of Solano County; the queue data does not give exact sites.