Muscat

Muscat is a 772 MW battery storage request withdrawn in the CAISO interconnection queue, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1939
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
McCall Substation 230 kV
Location
California
Technology
Battery: 772 MW
Total requested
772 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
November 2024
Withdrawn
November 2022

Location

No county location in the queue data.