Alta Q175 (Fka Alta 11)

Alta Q175 (Fka Alta 11) is a 650 MW onshore wind request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2007 (completed)
  2. Withdrawn / abandonedJun 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
175
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Whirlwind Substation 230kV
Location
Kern County, California
Technology
Wind: 650 MW
Total requested
650 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
21 February 2007
Proposed online date
December 2017
Withdrawn
June 2015

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.