🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

GAS · CAISO

South Bay Replacement - Option 1

South Bay Replacement - Option 1 is a 650 MW gas request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2004 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
230/138/69 kV South Bay (650 MW CC)
Location
San Diego County, California
Technology
Gas: 650 MW
Total requested
650 MW
Study phase
In Progress
Queue status
Withdrawn
Entered queue
23 February 2004
Proposed online date
January 2010

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Diego County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem