Palo Verde Mesa (Fka Brightsource Midpoint Solar)

Palo Verde Mesa (Fka Brightsource Midpoint Solar) is a 750 MW solar request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2010 (completed)
  2. Withdrawn / abandonedFeb 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
643AC
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Colorado River Sub 220 kV Bus
Location
Riverside County, California
Technology
Solar: 750 MW
Total requested
750 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 July 2010
Proposed online date
January 2015
Withdrawn
February 2013

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Riverside County