United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR + STORAGE Β· CAISOIcarus Wind and Solar
Icarus Wind and Solar is a 719 MW solar + storage request withdrawn in the CAISO interconnection queue, connecting to SCE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 54616
- Grid region
- CAISO (California)
- Utility / transmission owner
- SCE
- Connection point (POI)
- MOHAVE 500 kV
- Location
- California
- Technology
- Solar: 718 MW Β· Battery: 1.0 MW
- Total requested
- 719 MW
- Service type
- Energy only (ERIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- December 2028
- Withdrawn
- December 2024
Location
Marker shows the centre of County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in County
- Other project Q617, Mohave CountyOther Β· 1,000 MW Β· in study
- Solar + storage project 2023-MP2, Mohave CountySolar + storage Β· 600 MW Β· in study
- Other project 2024-G4, Mohave CountyOther Β· 550 MW Β· in study
- Onshore wind project NC5-008, Mohave CountyOnshore wind Β· 500 MW Β· in study
- Battery storage project 2023-G16, Mohave CountyBattery storage Β· 500 MW Β· in study
- Battery storage project 2023-G15, Mohave CountyBattery storage Β· 500 MW Β· in study
- Battery storage project 2024-MP2, Mohave CountyBattery storage Β· 500 MW Β· in study
- Battery storage project 2024-MP1, Mohave CountyBattery storage Β· 500 MW Β· in study
- Solar + storage project 25-00421, Mohave CountySolar + storage Β· 500 MW Β· in study
- Onshore wind project 2024-G5, Mohave CountyOnshore wind Β· 300 MW Β· in study
- Onshore wind project NC5-009, Mohave CountyOnshore wind Β· 300 MW Β· in study
- Solar + storage project 2023-G17, Mohave CountySolar + storage Β· 300 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem