United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Juglans Energy Storage

Juglans Energy Storage is a 711 MW battery storage request withdrawn in the CAISO interconnection queue, in Solano County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedAug 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1847
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Vaca-Dixon 500 kV
Location
Solano County, California
Technology
Battery: 711 MW
Total requested
711 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
February 2031
Withdrawn
August 2025

Location

Marker shows the centre of Solano County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Solano County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem