United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Adastra Hybrid Solar

Adastra Hybrid Solar is a 709 MW solar + storage request withdrawn in the CAISO interconnection queue, in Tulare County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2069
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Springville Substation 230 kV
Location
Tulare County, California
Technology
Solar: 355 MW · Battery: 355 MW
Total requested
709 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
December 2025
Withdrawn
November 2022

Location

Marker shows the centre of Tulare County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Tulare County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem